01. | East Coast Railway | Plate Load test, Pile Load Test, Geotechnical Investigation | Bhadrak-Byree 3rd Line Project “Execution of Earth Work in Formation, Major Bridges, Minor Bridges, Service Buildings, Ballast Supply, P. Way linking, General Electrification of service buildings, other Allied works in between Ranital Junction to Jakhapura (57km approx.) and Haridaspur to Byree (16 Km appx.) of East Coast Railway. |
02. | BSNL | Geotechnical Investigation | Installation of infrastructure Items in the uncovered Villages of India for Cluster 1 of Odisha Areas under 4G Saturation Project against BSNL Project |
03. | JSPL | Geotechnical Investigation | Soil Investigation work along the pipeline route for BARBIL- ANGUL slurry pipe line project in the state of Odisha, India. |
04. | Zetwerk manufacturing Pvt Ltd | Geotechnical Investigation, Pile load & Plate load Test. | Execution of earth work in formation, major bridges, minor bridges, service buildings, ballast supply, P. way, linking, general electrification of service buildings and other allied works in between Ranital Junction to Jakhapura |
05. | OBCC | Geotechnical Investigation | Revival of Musa River (Phase-II) and Development of Puri Lake in the Heritage City of Puri under ABHADA Scheme on Turnkey Basis |
06. | Nuvoco | Geotechnical Investigation | Construction of Ready Mix plant at Khurdha |
07. | East coast Railway, Angul | EV2 | Talcher-Bimalagarh new B.G Rail Link Project: “Execution of E/W & minor bridges from Km: 43.55 to Km: 52.60, construction of 42-unit staff quarters (G+2 storeyed, Type-11-04 units at Samal, 04 units at Parabil& 32 units at Khamar, Type- III. 02 units at Khamar), SSP buildings at Samal & Khamar, TSS building at Parabil including electrification and other allied works. |
08. | East coast Railway, Sambalpur | Geotechnical Investigation | Geotechnical Investigation For “Brundamal Jharsuguda Fly Over connecting DN Line: Execution of Earth Work in formation, Minor Bridges Between Km 0.00 (Jharsuguda CSB) to Km 6.6 Brundamal Yard), Viaduct (Ch. 1314m to 1736m, Ch. 1980m to 2492m & Ch. 2574m to 2740m), ROR (Ch. 2492m to Ch. 2574m) and Other Misc. in connection with construction of Brundamal Jharsuguda Fly Over Connection for Joining DN Line. |
09. | East coast Railway, Sambalpur | Geotechnical Investigation | Geotechnical Investigation at Sambalpur Sasan – Sarala 3rd & 4th Line |
10. | OBCC | Geotechnical Investigation | Integrated Development of Loakanath Temple & Parvati Sagar, Puri under ABHADA Scheme on Turnkey basis” |
11. | South East Railway | Geotechnical Investigation & Material testing | Jharsuguda- Execution of work for construction of Road Over Bridge No. 07 (Span :1x30m Composite Girder) at Kechobahal, Road over Bridge No. 10 (Span: 1x60m Bowstring Girder) at Barpali and Road Over Bridge No.11 (Span: 1x30m Composite girder) at Sardega in connection with Jharsuguda-Barpali-Sardega Mahanadi Coalfields Limited Doubling Work under the jurisdiction of DyCE/Con/Jharsuguda in Chakradharpur division of S. E Railway. |
12. | NHAI | Survey & Geotech | Construction of FOB on NH 316 at Satsang Vihar Bhubaneswar |
13. | NHAI | Survey & Geotech | Construction of FOB on NH 316 at Crown Hotel Bhubaneswar |
14. | NHAI | Survey, Geotech & Quality control Testing | Construction of Underpass at SALAPADA along with approaches from km. 37.920 to km 38.772 on Panikoili Rimuli of NH 20 in the state of Odisha on EPC Mode. |
15. | NHAI | Survey, Geotech & Quality control Testing | Construction of Underpass at LANGALKANTI from km. 88.690 to km. 89.470 on PanikoiliRimuli section of NH 20 in the state of Odisha on EPC Mode. |
16. | NHAI | Geotechnical Investigation | Construction of Chandikhole-Paradip section of NH-5A is the “Six lanes of Chandikhole-Paradip section of NH-5A |
17. | JSW | Geotechnical Investigation | Construction of Boundary wall of JSW at DhinkiaParadeep |